With the deepening of social development, rapid urban construction in the urban areas, followed by a substantial increase in construction waste. How to deal with a large amount of construction waste?
Shanghai Clirik Machinery answer you, The bricks and concrete produced from the demolished illegal buildings will be crushed into pieces and blended with the deep-built construction waste black silt produced in the construction site and fired into standard bricks, which can be widely used in various construction projects.
Depending on the material granularity of the construction waste crushed, the construction waste recycled aggregate may be used for the following purposes:
1, 0-2.5mm recycled material: Used as the main raw material for wiping mortar; or instead of river sand.
2, 0-4.5mm recycled material: Used as the main raw material for bricklaying mortar.
3, 2.5 / 4.5-10mm recycled materials: used as the main raw material for brick making.
4, 10-32mm recycled materials: used as road building materials.
Recycled material larger than 32 mm: it will re-enter the crusher to be crushed; or used to fill the embankment.